Customer challenges
Provide operator with a short-term barrier to separate stages during stimulation operations.
Expro Excellence
- Expro's BIG EASY® Frac Plug enabled vertical run in speeds of ~600 feet per minute and horizontal speeds of over 450 feet per minute.
- Simple installation of BIG EASY® Frac Plug on standard setting tool.
- Superior engineered design to prevent presetting.
- Robust holding capability to prevent slipping.
- Composite slip design to ensure ease of removal.
- Ball run in place conserves water
Value to client
- Due to its robust design, the BIG EASY® was installed at running speeds of ~420 feet per minute.
- By having the ball run in place, the customer was able to save approximately 15,000 barrels of water over an average ball drop.
- Expro’s BIG EASY® design enabled the customer to flow back the well after one stage screened off.
- The highly engineered composite material enabled drill out times of four-and-a-half to six minutes with standard drill out procedures.