Customer challenges
  • A Middle East operator was carrying out a major field expansion offshore while continuing to develop their existing assets
  • They required onsite gas and water analysis during production testing of their new wells along with sample collection for offsite PVT analysis and further fluid characterization
Expro Excellence
  • Expro identified, sourced, and mobilized analytical equipment to cover the entire scope of work for the first two packages within three months and had six packages ready within six months
  • Our equipment was contained within newly built, bespoke, Zone 1 rated laboratory cabins
  • We rapidly expanded our team of experienced chemists for this project, using remote recruitment and training due to COVID restrictions
  • Expro implemented an onshore QA regime to ensure the data quality utilizing engineers and support staff from the technical centers based in the UK and Norway
  • Data was comparable with that obtained onshore, but reported within hours of sampling and continuously over a twenty-four-hour period enabling the client to observe the well performance in real time and rapidly respond to any changes
Value to client
  • The operator was able to monitor the well clean up in real time with assessment of the performance of acidification treatment
  • They were able to end clean up as soon as criteria were met, thus avoiding unnecessarily protracted flow periods, saving rig time, costs and minimizing emissions
  • Comprehensive data of reservoir fluid properties across the field was obtained
  • Average JPR of 93%
  • Over 21,000 hours with zero NPT or HSE incident
Contact

Enhanced production test monitoring through onsite analysis package

In Brief
The operator was able to monitor the well clean up in real time with assessment of the performance of stimulation activities
Product Line
  • Fluids sampling and analysis
Region
Middle East And North Africa
Customer challenges
  • A Middle East operator was carrying out a major field expansion offshore while continuing to develop their existing assets
  • They required onsite gas and water analysis during production testing of their new wells along with sample collection for offsite PVT analysis and further fluid characterization
Expro Excellence
  • Expro identified, sourced, and mobilized analytical equipment to cover the entire scope of work for the first two packages within three months and had six packages ready within six months
  • Our equipment was contained within newly built, bespoke, Zone 1 rated laboratory cabins
  • We rapidly expanded our team of experienced chemists for this project, using remote recruitment and training due to COVID restrictions
  • Expro implemented an onshore QA regime to ensure the data quality utilizing engineers and support staff from the technical centers based in the UK and Norway
  • Data was comparable with that obtained onshore, but reported within hours of sampling and continuously over a twenty-four-hour period enabling the client to observe the well performance in real time and rapidly respond to any changes
Value to client
  • The operator was able to monitor the well clean up in real time with assessment of the performance of acidification treatment
  • They were able to end clean up as soon as criteria were met, thus avoiding unnecessarily protracted flow periods, saving rig time, costs and minimizing emissions
  • Comprehensive data of reservoir fluid properties across the field was obtained
  • Average JPR of 93%
  • Over 21,000 hours with zero NPT or HSE incident