Expro Excellence
Subsea Well Access
Expro completes 18 well abandonment campaign
Customer challenges
  • Expro’s client had the requirement for a subsea well access system to provide well barriers during a subsea well abandonment campaign in Australia
  • This abandonment campaign was to be carried out by a MODU already contracted to client
  • Expro supported our client with the provision of Intervention Riser System (IRS), controls package (SPS Xmas tree and IRS controls) to support our client by providing a complete integrated Intervention Riser and controls package
  • Expro provided project management, interface engineering and service personnel to deliver the full scope, which included a compact IRS, surface flow-head, umbilical’s, topsides control equipment and IWOCs package under the one integrated project
  • Our customer required a rental Intervention Riser System (IRS) as their subsea well access method to interface with the XT because:
    • XT type and upper interface could not accommodate a drilling BOP
    • The original field development workover system was no longer available
    • Coil tubing intervention as a contingency was ruled out of RWIS
Expro Excellence
  • Expro's facility in Perth, Australia was upgraded with a custom built area specifically for stacking and maintaining Intervention Riser System (IRS)
  • IRS system was successfully bunny hopped for 7 wells in the schedule: system remained subsea for 44 days with no operational issues
  • Continued to provide first class support through difficult circumstances due to COVID-19 restrictions
Value to client
  • Expro implemented operational and safety learnings from a recent campaign which utilized the same Xmas tree design
  • Subsea well access phase on all 18 wells completed in 116 days
  • Significant time/cost savings to client with campaign being completed in excess of 20 days under budget
  • IWOCS for Xmas Tree controls interfaced and provided under the same contract, negating the requirement for additional interfacing and 3rd party personnel
Contact

Expro completes 18 well abandonment campaign

In Brief
Expro supported our client with the provision of Intervention Riser System (IRS), Controls package (SPS Xmas tree and IRS controls) to support our client by providing a complete integrated Intervention Riser and controls package
Product Line
  • Subsea Well Access
Region
Asia-Pacific
Customer challenges
  • Expro’s client had the requirement for a subsea well access system to provide well barriers during a subsea well abandonment campaign in Australia
  • This abandonment campaign was to be carried out by a MODU already contracted to client
  • Expro supported our client with the provision of Intervention Riser System (IRS), controls package (SPS Xmas tree and IRS controls) to support our client by providing a complete integrated Intervention Riser and controls package
  • Expro provided project management, interface engineering and service personnel to deliver the full scope, which included a compact IRS, surface flow-head, umbilical’s, topsides control equipment and IWOCs package under the one integrated project
  • Our customer required a rental Intervention Riser System (IRS) as their subsea well access method to interface with the XT because:
    • XT type and upper interface could not accommodate a drilling BOP
    • The original field development workover system was no longer available
    • Coil tubing intervention as a contingency was ruled out of RWIS
Expro Excellence
  • Expro's facility in Perth, Australia was upgraded with a custom built area specifically for stacking and maintaining Intervention Riser System (IRS)
  • IRS system was successfully bunny hopped for 7 wells in the schedule: system remained subsea for 44 days with no operational issues
  • Continued to provide first class support through difficult circumstances due to COVID-19 restrictions
Value to client
  • Expro implemented operational and safety learnings from a recent campaign which utilized the same Xmas tree design
  • Subsea well access phase on all 18 wells completed in 116 days
  • Significant time/cost savings to client with campaign being completed in excess of 20 days under budget
  • IWOCS for Xmas Tree controls interfaced and provided under the same contract, negating the requirement for additional interfacing and 3rd party personnel