Expro Excellence
Subsea Well Access
High pressure, high integrity, fast response subsea landing string for BP’s Shah Deniz
Customer challenges
  • BP required a subsea completion safety system for the well commissioning of Shah Deniz 2 (SD2), a subsea development in Azerbaijan; This project is one of BP’s largest investments requiring a 12 year drilling program to access 50 trillion cubic feet of gas
  • Particular requirements were for a fast response system rapidly securing these high rate wells while taking out some of the complexity of Expro’s deepwater electo- hydraulic control system
  • Technology that was robust for long-term use in a harsh operating environment with well pressures of up to 15,000 psi, with the capability of functioning in wells where there is the potential for debris
  • The capability to provide full local support, including a Baku facility to fully service equipment over the duration of the contract, and engineering support
  • BP were looking for a partner that would support and encourage the development of Azeri nationals 
Expro Excellence
  • Expro developed a new rapid response control system, focused on safety critical functions
  • Developed a new 15K lubricator valve, based on Expro’s unique high integrity ball valve (HIBV) technology
  • Delivered a 15K ELSA-HP system on schedule and have conducted a successful SIT (system integration test)
  • New facility in Baku, designed for full subsea service capability
  • Recruitment of four Azeri nationals and investment in a comprehensive training programme, that included secondments to Broussard and Aberdeen 
Value to client
  • Delivery of a system that that will enable the safe completion and flow back of high rate, high pressure wells
  • A system that has met BP’s exacting technical requirements and has passed through BP’s TRAP (Technical Risk Assurance Process)
  • On time delivery of a complex system allowing BP to maintain the schedule on one of their most important field developments
  • Design and qualification of equipment built on established technology that meets BP’s exact requirements for the SD2 project
  • Design and qualification of equipment which has an application on other BP developments 
Contact

High pressure, high integrity, fast response subsea landing string for BP’s Shah Deniz

In Brief
Expro’s Subsea team adapt to BP’s requirements for Shah Deniz 2 to provide a high pressure, high integrity, fast response subsea landing string
Product Line
  • Subsea Well Access
Region
Europe and Sub Saharan Africa
Customer challenges
  • BP required a subsea completion safety system for the well commissioning of Shah Deniz 2 (SD2), a subsea development in Azerbaijan; This project is one of BP’s largest investments requiring a 12 year drilling program to access 50 trillion cubic feet of gas
  • Particular requirements were for a fast response system rapidly securing these high rate wells while taking out some of the complexity of Expro’s deepwater electo- hydraulic control system
  • Technology that was robust for long-term use in a harsh operating environment with well pressures of up to 15,000 psi, with the capability of functioning in wells where there is the potential for debris
  • The capability to provide full local support, including a Baku facility to fully service equipment over the duration of the contract, and engineering support
  • BP were looking for a partner that would support and encourage the development of Azeri nationals 
Expro Excellence
  • Expro developed a new rapid response control system, focused on safety critical functions
  • Developed a new 15K lubricator valve, based on Expro’s unique high integrity ball valve (HIBV) technology
  • Delivered a 15K ELSA-HP system on schedule and have conducted a successful SIT (system integration test)
  • New facility in Baku, designed for full subsea service capability
  • Recruitment of four Azeri nationals and investment in a comprehensive training programme, that included secondments to Broussard and Aberdeen 
Value to client
  • Delivery of a system that that will enable the safe completion and flow back of high rate, high pressure wells
  • A system that has met BP’s exacting technical requirements and has passed through BP’s TRAP (Technical Risk Assurance Process)
  • On time delivery of a complex system allowing BP to maintain the schedule on one of their most important field developments
  • Design and qualification of equipment built on established technology that meets BP’s exact requirements for the SD2 project
  • Design and qualification of equipment which has an application on other BP developments 