Customer challenges
- Expro’s client were optimizing liner shoe track to avoid challenging drill out with small BHA at high temperature 199°C (390°F), whilst enabling for optimal primary cementing
Expro Excellence
- Expro were able to offer a combined solution with SeaCure® RS Cementing and CureCatcher®, which delivered a 1.2m (3.9ft) shoe track and slurry mechanical separation to the shoe
Value to client
- Quality primary cement job with perfect CBL results
- Optimized 1.2m (3.9ft) shoe track solution
- No clean out trips required
- Post cement job full wellbore circulation with work string already at TD