Expro delivers production optimisation study in 6 weeks
Customer challenges
  • Reposol Sinopec Resources UK Ltd requested an independent technical study of 28 wells that had the potential to add incremental production from their assets
  • The objective of the project was to quantify and estimate the cost of the additional production opportunities.  The four work categories evaluated were:
  • Artificial Lift optimisation - Gas Lift Valve deepening and evaluation of ESP change out benefit
  • Petroleum Behind pipe - additional perforations and water shut off
  • Evaluation of Water Injector optimisation strategies
  • Resolution of well access/integrity issues - Coiled Tubing clean out and fishing
  • The well hopper project output would inform the forthcoming 2020 business plan and associated work schedules
Expro Excellence
  • Expro leveraged the expertise of our Petroleum Engineering Solutions team and Well Intervention capabilities to create a unique value proposition. This time-bound project was delivered on schedule because the Expro team were flexible, communicated well and were quick to adapt to changing circumstances
  • Repsol Sinopec received detailed credible production projections and well intervention costs in order to make important investment decisions for each well
  • The key Engineering disciplines engaged were Reservoir Engineering and Production Technology
Value to client
  • Incremental production opportunities were calculated by comparing production models following interventions with 'do nothing' scenarios
  • Intervention cost estimates were built from detailed intervention work scopes
  • Expro applied consistent workflows that modelled opportunities across six assets
  • Reposol Sinopec's work programs will change as a result of these new insights
Contact

Expro delivers production optimisation study in 6 weeks

In Brief
Expro delivers 28 Well Hopper production optimisation study in 6 weeks
Product Line
  • Petroleum Engineering Solutions
Region
Europe and Sub Saharan Africa
Customer challenges
  • Reposol Sinopec Resources UK Ltd requested an independent technical study of 28 wells that had the potential to add incremental production from their assets
  • The objective of the project was to quantify and estimate the cost of the additional production opportunities.  The four work categories evaluated were:
  • Artificial Lift optimisation - Gas Lift Valve deepening and evaluation of ESP change out benefit
  • Petroleum Behind pipe - additional perforations and water shut off
  • Evaluation of Water Injector optimisation strategies
  • Resolution of well access/integrity issues - Coiled Tubing clean out and fishing
  • The well hopper project output would inform the forthcoming 2020 business plan and associated work schedules
Expro Excellence
  • Expro leveraged the expertise of our Petroleum Engineering Solutions team and Well Intervention capabilities to create a unique value proposition. This time-bound project was delivered on schedule because the Expro team were flexible, communicated well and were quick to adapt to changing circumstances
  • Repsol Sinopec received detailed credible production projections and well intervention costs in order to make important investment decisions for each well
  • The key Engineering disciplines engaged were Reservoir Engineering and Production Technology
Value to client
  • Incremental production opportunities were calculated by comparing production models following interventions with 'do nothing' scenarios
  • Intervention cost estimates were built from detailed intervention work scopes
  • Expro applied consistent workflows that modelled opportunities across six assets
  • Reposol Sinopec's work programs will change as a result of these new insights