Expro Excellence
CoilHose
CoilHose well jetting remediation on iSSSV
Customer challenges
  • Customer had a 2 3/8" injection string tubing retrievable injection subsurface safety valve (iSSSV) in the stuck open position
  • Previous mechanical intervention attempts with conventional brushes and exercise tools were unsuccessful
  • A camera run performed identified significant deposits of a heavy grease like substance along the length of the iSSSV which was believed to be preventing the flapper from operating
  • CoilHose was selected as the optimum method for jetting and fluid circulation in order to reinstate the integrity of the iSSSV
  • Contingency operations involved further mechanical intervention to lock out the iSSSV and set an insert valve
Expro Excellence
  • Bespoke engineered solution deploying the latest Expro technology
  • A collaborative approach to developing the well programme with the customer
  • Pre-mobilisation SIT ensured confidence in the effectiveness of the proposed jetting solution
  • Multi-disciplined crew received commendation for contribution to the platform safety processes
Value to client
  • All programme objectives were achieved and integrity restored to the iSSSV
  • Ability to maintain maximum thru bore of 2 3/8" tubing string without the need to lockout iSSSV and set insert valve
  • Safeguarding of future production from the well
  • Two runs performed that included five 'jetting passes' with no miss runs
  • Minimal footprint and rig up time versus conventional coil tubing allowed increased operational efficiency
Contact

CoilHose well jetting remediation on iSSSV

In Brief
Expro performs CoilHose well jetting remediation on iSSSV
Product Line
  • CoilHose
Region
Europe and Sub Saharan Africa
Customer challenges
  • Customer had a 2 3/8" injection string tubing retrievable injection subsurface safety valve (iSSSV) in the stuck open position
  • Previous mechanical intervention attempts with conventional brushes and exercise tools were unsuccessful
  • A camera run performed identified significant deposits of a heavy grease like substance along the length of the iSSSV which was believed to be preventing the flapper from operating
  • CoilHose was selected as the optimum method for jetting and fluid circulation in order to reinstate the integrity of the iSSSV
  • Contingency operations involved further mechanical intervention to lock out the iSSSV and set an insert valve
Expro Excellence
  • Bespoke engineered solution deploying the latest Expro technology
  • A collaborative approach to developing the well programme with the customer
  • Pre-mobilisation SIT ensured confidence in the effectiveness of the proposed jetting solution
  • Multi-disciplined crew received commendation for contribution to the platform safety processes
Value to client
  • All programme objectives were achieved and integrity restored to the iSSSV
  • Ability to maintain maximum thru bore of 2 3/8" tubing string without the need to lockout iSSSV and set insert valve
  • Safeguarding of future production from the well
  • Two runs performed that included five 'jetting passes' with no miss runs
  • Minimal footprint and rig up time versus conventional coil tubing allowed increased operational efficiency
Contact

For further information, please contact:

[email protected]