Expro Excellence
Frank’s Tubular Running Services (TRS)
Frank’s Tubular Running Services successfully deploys new technologies in Gulf of Mexico completion run
Customer challenges

On March 26, 2017, a Frank’s International crew aboard a drillship in the Gulf of Mexico landed out the first completion as part of a major field development.

Expro Excellence

Multiple new technologies were deployed on the completions run, including the Frank’s Hydraulic Control Line Spider (HCLS750), 7 5/8-inch 500-ton completions elevator, Cantilever COBRA™ control line manipulator arm and the remote control FLUID GRIP® tong.

 

The FLUID GRIP® tong was deployed first to build stands on the auxiliary side rotary. After which, the HCLS750, 500-ton completions elevator, Cantilever COBRA™ and remote control FLUID GRIP® tong were used to run 19,502 feet of 5.5-inch 23- and 26-pound per foot tubing and 4,000 feet of 7-inch vacuum insulated tubing (VIT), for a total buoyed weight of 659,304 pounds. The control lines included two flatpacks and four lines. The HCLS750 and Cantilever COBRA™ were then used for the 3,637-foot landing string with a 3.5-inch umbilical and two 0.43-inch lines. The total buoyed weight landed out was 763,814 pounds.

 

While the completion was acknowledged as being complex and full of challenges, the operator considered it a success. The well head was successfully tied in and made ready to produce.

Value to client
Contact

Frank’s Tubular Running Services successfully deploys new technologies in Gulf of Mexico completion run

In Brief
On March 26, 2017, a Frank’s International crew aboard a drillship in the Gulf of Mexico landed out the first completion as part of a major field development.
Product Line
  • Frank’s Tubular Running Services (TRS)
Region
North and Latin America
Customer challenges

On March 26, 2017, a Frank’s International crew aboard a drillship in the Gulf of Mexico landed out the first completion as part of a major field development.

Expro Excellence

Multiple new technologies were deployed on the completions run, including the Frank’s Hydraulic Control Line Spider (HCLS750), 7 5/8-inch 500-ton completions elevator, Cantilever COBRA™ control line manipulator arm and the remote control FLUID GRIP® tong.

 

The FLUID GRIP® tong was deployed first to build stands on the auxiliary side rotary. After which, the HCLS750, 500-ton completions elevator, Cantilever COBRA™ and remote control FLUID GRIP® tong were used to run 19,502 feet of 5.5-inch 23- and 26-pound per foot tubing and 4,000 feet of 7-inch vacuum insulated tubing (VIT), for a total buoyed weight of 659,304 pounds. The control lines included two flatpacks and four lines. The HCLS750 and Cantilever COBRA™ were then used for the 3,637-foot landing string with a 3.5-inch umbilical and two 0.43-inch lines. The total buoyed weight landed out was 763,814 pounds.

 

While the completion was acknowledged as being complex and full of challenges, the operator considered it a success. The well head was successfully tied in and made ready to produce.

Value to client
Contact

For further information, please contact:

[email protected]