Customer challenges
- To reduce conductor WOC time and achieve a quality primary cement job on the first string of this high profile well
Expro Excellence
- SeaCure® delivering a quality primary cement job with the added benefit of rapid cement hydration technology, QuikCure® to reduce WOC on conductor to ~ 5hrs. The zero shoetrack solution also allowed for a simple and reliable drill out of the 30” shoe
Value to client
- Reduced conductor WOC time to ~5 hours
- Downhole temperature logger in BHA showing heat of hydration of cement ~2.5 hours after placement
- Cement job displacement volume reduced to 8bbls (1.3 m3)
- Simple and reliable drill ahead with shoe drilling out in 40 minutes
- CoreCure® downhole cement sample confirming hard, good quality cement at the shoe