MegaFlow™ separator allows ultra-high-rate gas flow with single train solution
Customer challenges
  • Conducting well clean-up on an offshore gas reservoir with a standard separator leads to larger footprint equipment and more time to flow back until the well can be handed over to production
  • Footprint and time both drive higher costs
  • The customer engaged Expro to provide a bespoke, ultra-high-rate well-test package designed for a maximum rate of 135MMscf/d with high Condensate Gas Ratios (CGR)
Expro Excellence
  • Expro deployed the MegaFlow™ ultra-high-rate separator single train package, which integrates industry-leading process safety best practices and enables flow rates up to 175MMscf/d 
  • It reduces operational complexity, risks, and crew headcount compared with a conventional solution of using two standard separators proposed by other service companies, therefore offering significant time and cost savings
  • The MegaFlow™ single train, ultra-high rate well test package was just one element of the broader integrated project management offering from Expro:
  • A Multi Tube High Efficiency Heat Exchanger ensured efficient and complete separation of the different phases
  • API 17G compliant, high temperature/debris tolerant Expro Landing String Assembly (ELSA) subsea safety system
  • Expro's unique sampling, and analysis package for mercury characterization
Value to client
  • The project has been successfully executed to date with 23 wells completed thus far
  • The enhanced throughput of our MegaFlow™ Ultra-High-Rate Test Separator shortened well clean-up time, saving high-value rig time and reducing the overall GHG emissions
  • Increased radius of investigation improving reservoir characterization for optimized production and management in the long term
  • Expro's best-in-class integrated safety system was deployed during this project, translating to exceptional HSE performance over 23 wells and 250,000 man-hours on the project thus far
Contact

MegaFlow™ separator allows ultra-high-rate gas flow with single train solution

In Brief
Expro deployed the MegaFlow™ ultra-high-rate separator single train package, which integrates industry-leading process safety best practices and enabled flow rates up to 175MMscf/d
Product Line
  • Well Flow Management
  • Well Testing
Region
Asia-Pacific
Customer challenges
  • Conducting well clean-up on an offshore gas reservoir with a standard separator leads to larger footprint equipment and more time to flow back until the well can be handed over to production
  • Footprint and time both drive higher costs
  • The customer engaged Expro to provide a bespoke, ultra-high-rate well-test package designed for a maximum rate of 135MMscf/d with high Condensate Gas Ratios (CGR)
Expro Excellence
  • Expro deployed the MegaFlow™ ultra-high-rate separator single train package, which integrates industry-leading process safety best practices and enables flow rates up to 175MMscf/d 
  • It reduces operational complexity, risks, and crew headcount compared with a conventional solution of using two standard separators proposed by other service companies, therefore offering significant time and cost savings
  • The MegaFlow™ single train, ultra-high rate well test package was just one element of the broader integrated project management offering from Expro:
  • A Multi Tube High Efficiency Heat Exchanger ensured efficient and complete separation of the different phases
  • API 17G compliant, high temperature/debris tolerant Expro Landing String Assembly (ELSA) subsea safety system
  • Expro's unique sampling, and analysis package for mercury characterization
Value to client
  • The project has been successfully executed to date with 23 wells completed thus far
  • The enhanced throughput of our MegaFlow™ Ultra-High-Rate Test Separator shortened well clean-up time, saving high-value rig time and reducing the overall GHG emissions
  • Increased radius of investigation improving reservoir characterization for optimized production and management in the long term
  • Expro's best-in-class integrated safety system was deployed during this project, translating to exceptional HSE performance over 23 wells and 250,000 man-hours on the project thus far