Completion Installation Solutions

We use our engineering expertise to tailor solutions to bring the most complex wells into production more efficiently.

Frank’s TRS has developed equipment for installing complex completion tubulars and associated components such as control lines and umbilicals that extend the life of the well safely and efficiently. We offer the industry’s only true non-marking handling system:

Collar Load Support (CLS™) System

FLUID GRIP® Makeup System

COMPLETION INSTALLATION CAPABILITIES

Pipe Size Range: 1.5” to 9.625”

Pipe Size Range (non-marking): 3 ½” to 7”

Hoist Capability: up to 750 tons

Hoist Capability (non-marking): up to 350 tons

Torque Capability: up to 70,000 ft-lbs

Torque Capability (non-marking): up to 70,000 ft-lbs

Areas Served: Land, Shelf, Deepwater

TOOLS

Collar Load Support (CLS™) System

FLUID GRIP® Technology

Shuttle Table System

Fine Point Insert Technology

High Capacity Torque Capability

Interlock Technology

Tong Manipulation Systems

Products & Services

Find detailed information about our products and services.